Freeport Quarry — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
09/07/2021 09/08/2021 Northern Illinois Material LLC 7.50 1
08/04/2020 08/04/2020 Northern Illinois Material LLC 3.50 1
02/13/2019 02/13/2019 Northern Illinois Material LLC 6.00 1