Fulton Pit — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/03/2010 | 05/03/2010 | Apac-Kansas Inc Shears Divisi... | 3.50 | 1 |
| 08/18/2009 | 08/18/2009 | Apac-Kansas Inc Shears Divisi... | 6.00 | 1 |
| 07/23/2009 | 07/23/2009 | Apac-Kansas Inc Shears Divisi... | 9.25 | 1 |
| 04/14/2008 | 04/15/2008 | Apac-Kansas Inc Shears Divisi... | 10.50 | 1 |