Golden Gate Quarry — Inspections

Total: 76 inspections

Begin End Operator Hours Inspectors
02/19/2008 02/21/2008 Conrad Yelvington Distributors 17.50 1
07/24/2007 07/25/2007 Conrad Yelvington Distributors 22.50 1
10/30/2006 11/01/2006 Conrad Yelvington Distributors 33.00 1
06/07/2006 08/21/2006 Conrad Yelvington Distributors 38.00 2
04/19/2006 04/21/2006 Conrad Yelvington Distributors 23.00 1
03/20/2006 03/21/2006 Conrad Yelvington Distributors 16.00 1
02/21/2006 02/21/2006 Conrad Yelvington Distributors 5.50 1
01/24/2006 01/26/2006 Conrad Yelvington Distributors 55.25 1
06/14/2005 06/14/2005 Conrad Yelvington Distributors 3.50 1
05/16/2005 05/19/2005 Conrad Yelvington Distributors 16.00 1
01/03/2005 01/05/2005 Conrad Yelvington Distributors 26.00 1
05/24/2004 05/24/2004 Conrad Yelvington Distributors 9.00 1
05/12/2004 05/13/2004 Conrad Yelvington Distributors 21.00 1
10/21/2003 10/21/2003 Conrad Yelvington Distributors 11.00 1
09/16/2003 09/16/2003 Conrad Yelvington Distributors 12.00 1
04/23/2003 04/23/2003 Conrad Yelvington Distributors 6.00 1
03/03/2003 03/04/2003 Apac-Florida Inc 20.00 1
08/14/2002 08/14/2002 Apac-Florida Inc 15.00 1
06/18/2002 06/20/2002 Apac-Florida Inc 5.00 1
06/18/2002 06/20/2002 Apac-Florida Inc 15.00 1
03/20/2002 03/20/2002 Apac-Florida Inc 10.00 1
05/15/2001 05/17/2001 Apac-Florida Inc 28.00 1
10/17/2000 10/18/2000 Apac-Florida Inc 11.00 1
10/04/2000 10/05/2000 Apac-Florida Inc 16.00 1
07/11/2000 07/12/2000 Apac-Florida Inc 12.00 1
02/02/2000 02/03/2000 Apac-Florida Inc 14.00 1