Goss Pit — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
08/06/2024 08/06/2024 Joy Engineering 0.50 1
10/31/2023 11/01/2023 Joy Engineering 3.00 1
09/09/2022 09/09/2022 Joy Engineering 5.00 1
10/25/2017 10/25/2017 Joy Engineering 4.75 1
08/23/2017 08/23/2017 Joy Engineering 3.25 1
07/13/2016 07/14/2016 Joy Engineering 8.75 1
07/29/2015 07/29/2015 Joy Engineering 3.00 1
07/20/2015 07/22/2015 Joy Engineering 18.50 1
07/08/2014 07/09/2014 Joy Engineering 4.50 1