Gravero Rodriguez, Manati — Inspections

Total: 159 inspections

Begin End Operator Hours Inspectors
03/06/2002 03/06/2002 Betteroads Asphalt Corp 8.00 1
10/02/2001 10/02/2001 Betteroads Asphalt Corp 4.00 2
07/10/2001 07/10/2001 Betteroads Asphalt Corp 10.00 1
05/23/2001 05/23/2001 Betteroads Asphalt Corp 3.00 1
04/30/2001 05/01/2001 Betteroads Asphalt Corp 28.00 2
11/27/2000 11/27/2000 Betteroads Asphalt Corp 5.00 1
11/08/2000 11/08/2000 Betteroads Asphalt Corp 15.00 1
02/09/2000 02/09/2000 Betteroads Asphalt Corp 2.00 1
01/13/2000 01/13/2000 Betteroads Asphalt Corp 2.00 1