Grove #1 Mine — Inspections

Total: 57 inspections

Begin End Operator Hours Inspectors
03/29/2000 03/29/2000 Carbolith Extraction Inc 3.75 1
03/27/2000 03/27/2000 Carbolith Extraction Inc 1.50 1
03/27/2000 03/27/2000 Carbolith Extraction Inc 1.50 1
03/13/2000 05/22/2000 Carbolith Extraction Inc 14.50 1
03/10/2000 03/31/2000 Carbolith Extraction Inc 63.25 4
03/10/2000 03/31/2000 Carbolith Extraction Inc 23.00 3
01/13/2000 01/14/2000 Carbolith Extraction Inc 2.50 1