GSM #1 — Inspections

Total: 20 inspections

Begin End Operator Hours Inspectors
10/20/2025 10/21/2025 Toano Contractors, Inc. 20.00 1
05/05/2025 05/07/2025 Toano Contractors, Inc. 14.00 1
10/01/2024 10/02/2024 Toano Contractors, Inc. 15.25 1
05/22/2024 05/28/2024 Toano Contractors, Inc. 2.50 1
04/16/2024 05/03/2024 Toano Contractors, Inc. 39.50 1
11/08/2023 11/15/2023 Toano Contractors, Inc. 32.50 1
05/10/2023 05/10/2023 Toano Contractors, Inc. 6.00 1
04/19/2023 04/20/2023 Toano Contractors, Inc. 15.75 1
02/07/2023 02/09/2023 Toano Contractors, Inc. 28.00 1
05/15/2022 06/02/2022 Toano Contractors, Inc. 62.50 1
01/10/2022 01/13/2022 Toano Contractors, Inc. 23.50 1
04/19/2021 04/23/2021 Toano Contractors, Inc. 18.50 1
03/16/2020 03/18/2020 Toano Contractors, Inc. 19.00 1
07/01/2019 07/02/2019 Toano Contractors, Inc. 8.25 1
04/17/2018 04/17/2018 Longhill Excavating 8.50 1
12/06/2016 12/06/2016 Longhill Excavating 5.25 1
02/24/2016 02/24/2016 Longhill Excavating II, LLC 5.00 1
10/20/2015 10/20/2015 Longhill Excavating II, LLC 8.25 1
03/18/2015 03/18/2015 Longhill Excavating II, LLC 1.00 1
03/17/2015 03/18/2015 Longhill Excavating II, LLC 22.50 1