Gunnison River Gravel Pits 1 & 5 — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
05/14/2025 05/14/2025 CW Construction, LLC 12.00 1
03/19/2025 03/19/2025 CW Construction, LLC 2.50 1
09/23/2024 09/25/2024 CW Construction, LLC 15.25 1
09/07/2023 09/07/2023 CW Construction, LLC 6.00 1
07/19/2023 07/19/2023 CW Construction, LLC 1.50 1
09/22/2022 09/22/2022 CW Construction, LLC 2.50 1
09/13/2021 09/13/2021 CW Construction, LLC 6.00 1
11/26/2018 11/28/2018 CW Construction, LLC 27.50 1