Hackers Creek Mine No 1 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
06/14/2001 06/14/2001 Three-C Mining Inc 7.00 1
10/17/2000 02/02/2001 Three-C Mining Inc 28.00 1
06/12/2000 06/12/2000 Three-C Mining Inc 2.00 1
05/22/2000 05/23/2000 Three-C Mining Inc 19.00 1
02/23/2000 02/23/2000 Three-C Mining Inc 5.00 1
01/10/2000 02/23/2000 Three-C Mining Inc 20.50 2