HANCOCK PLANT — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
12/03/2003 12/03/2003 J P Berzinis Inc 11.00 1
12/05/2002 12/06/2002 J P Berzinis Inc 4.00 1
10/28/2002 10/30/2002 J P Berzinis Inc 14.00 1
06/05/2001 06/07/2001 J P Berzinis Inc 35.00 1
08/15/2000 08/15/2000 J P Berzinis Inc 8.00 1
07/25/2000 07/25/2000 J P Berzinis Inc 19.00 1