HARRIS GRAVEL BANK — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
12/29/2000 12/29/2000 G W Harris Construction 8.00 1
11/07/2000 11/09/2000 G W Harris Construction 14.00 1
11/07/2000 11/09/2000 G W Harris Construction 10.00 1