HARTINGTON GRAVEL PIT — Inspections

Total: 14 inspections

Begin End Operator Hours Inspectors
06/06/2007 06/06/2007 Hartington Gravel Inc 4.00 1
05/16/2007 05/17/2007 Hartington Gravel Inc 12.00 1
08/01/2006 08/01/2006 Hartington Gravel Inc 11.50 1
02/01/2005 02/01/2005 Hartington Gravel Inc 3.00 1
11/17/2004 11/17/2004 Hartington Gravel Inc 49.00 2
07/13/2004 07/13/2004 Hartington Gravel Inc 11.00 1
07/30/2003 07/30/2003 Hartington Gravel Inc 2.00 1
06/18/2003 06/19/2003 Hartington Gravel Inc 14.00 1
10/22/2002 10/22/2002 Hartington Gravel Inc 3.00 1
04/16/2002 04/16/2002 Hartington Gravel Inc 14.00 2
10/16/2001 10/16/2001 Hartington Gravel Inc 4.00 1
08/14/2001 08/14/2001 Hartington Gravel Inc 9.00 1
09/13/2000 09/14/2000 Hartington Gravel Inc 6.00 1
05/09/2000 05/11/2000 Hartington Gravel Inc 19.00 1