Hearne Plant — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/18/2026 | 02/19/2026 | Travis Materials East Central... | 18.50 | 1 |
| 04/14/2025 | 04/17/2025 | Travis Materials East Central... | 33.75 | 1 |
| 10/22/2024 | 10/22/2024 | Travis Materials East Central... | 8.00 | 1 |
| 06/05/2024 | 06/05/2024 | Travis Materials East Central... | 9.00 | 1 |