HERREID CONCRETE — Inspections

Total: 42 inspections

Begin End Operator Hours Inspectors
06/18/2025 06/18/2025 Herreid Concrete 3.75 1
06/10/2025 06/11/2025 Herreid Concrete 17.00 1
07/25/2024 07/25/2024 Herreid Concrete 10.50 1
06/22/2023 06/22/2023 Herreid Concrete 17.75 1
07/27/2022 07/27/2022 Herreid Concrete 10.00 1
07/27/2021 08/03/2021 Herreid Concrete 14.50 1
03/19/2021 03/25/2021 Herreid Concrete 1.50 1
07/06/2020 07/07/2020 Herreid Concrete 18.50 1
11/13/2018 11/14/2018 Herreid Concrete 27.00 1
10/17/2017 10/17/2017 Herreid Concrete 4.25 1
10/03/2017 10/05/2017 Herreid Concrete 28.75 1
01/18/2017 01/18/2017 Herreid Concrete 10.00 1
12/22/2016 12/22/2016 Herreid Concrete 9.25 1
12/07/2016 12/07/2016 Herreid Concrete 29.00 1
03/16/2016 03/17/2016 Herreid Concrete 0.25 1
03/16/2016 03/17/2016 Herreid Concrete 10.25 1
09/15/2015 09/15/2015 Herreid Concrete 7.75 1
11/18/2012 11/18/2012 Herreid Concrete 1.00 1
12/28/2011 12/28/2011 Herreid Concrete 7.25 1
09/01/2011 09/01/2011 Herreid Concrete 1.00 1
12/16/2010 12/16/2010 Herreid Concrete 12.00 1
11/09/2010 11/09/2010 Herreid Concrete 24.00 1
09/28/2010 09/28/2010 Herreid Concrete 12.00 1
12/01/2009 12/01/2009 Herreid Concrete 9.00 1
11/04/2009 11/04/2009 Herreid Concrete 16.25 1
11/05/2008 11/05/2008 Herreid Concrete 11.00 1
10/16/2008 10/16/2008 Herreid Concrete 12.00 1
04/09/2008 04/09/2008 Herreid Concrete 16.00 1
08/08/2007 08/09/2007 Herreid Concrete 14.00 1
08/24/2006 08/25/2006 Herreid Concrete 12.00 1
09/28/2005 09/28/2005 Herreid Concrete 14.25 1
08/18/2004 08/18/2004 Herreid Concrete 10.00 1
05/12/2004 05/12/2004 Herreid Concrete 6.00 2
03/31/2004 03/31/2004 Herreid Concrete 8.00 1
06/25/2003 06/25/2003 Herreid Concrete 11.00 1
09/24/2002 09/24/2002 Herreid Concrete 6.00 1
09/24/2001 09/24/2001 Herreid Concrete 4.00 1
08/28/2001 08/28/2001 Herreid Concrete 8.00 2
08/07/2001 08/08/2001 Herreid Concrete 11.00 1
09/14/2000 09/14/2000 Herreid Concrete 7.00 1
09/07/2000 09/07/2000 Herreid Concrete 8.00 1
08/24/2000 08/24/2000 Herreid Concrete 3.00 1