Herring — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
08/15/2013 08/15/2013 G/P Jenkins Inc 2.25 1
02/29/2012 02/29/2012 G/P Jenkins Inc 8.50 1
09/29/2011 09/29/2011 G/P Jenkins Inc 6.00 1
09/22/2011 09/23/2011 G/P Jenkins Inc 6.50 1
09/20/2011 09/21/2011 G/P Jenkins Inc 13.50 1