High Valley Conrete LLC — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
08/06/2003 08/06/2003 High Valley Concrete Llc 7.00 1
02/19/2003 02/19/2003 High Valley Concrete Llc 7.00 1
10/23/2001 10/24/2001 High Valley Concrete Llc 18.00 1
08/07/2001 08/08/2001 High Valley Concrete Llc 10.00 1
07/10/2001 07/11/2001 High Valley Concrete Llc 19.00 1
09/20/2000 09/20/2000 High Valley Concrete Llc 6.00 1
07/24/2000 07/24/2000 High Valley Concrete Llc 11.00 1
07/18/2000 07/19/2000 High Valley Concrete Llc 26.00 2