HIGHLAND URANIUM PROJECT — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
06/19/2002 06/20/2002 Power Resources Inc 29.00 2
01/23/2001 01/25/2001 Power Resources Inc 28.00 1
02/02/2000 02/04/2000 Power Resources Inc 16.00 1