Holden No 22 Surface Mine — Inspections

Total: 18 inspections

Begin End Operator Hours Inspectors
01/23/2003 01/24/2003 Rio Group Inc 10.00 1
08/02/2002 08/19/2002 Rio Group Inc 12.00 1
03/12/2002 03/28/2002 Rio Group Inc 28.00 1
02/06/2002 02/06/2002 Rio Group Inc 4.50 1
01/23/2002 02/20/2002 Rio Group Inc 12.50 1
11/28/2001 11/28/2001 Rio Group Inc 3.00 1
10/23/2001 10/23/2001 Rio Group Inc 2.50 1
07/16/2001 07/16/2001 Rio Group Inc 12.00 1
05/04/2001 08/13/2001 Rio Group Inc 111.00 1
04/17/2001 04/20/2001 Rio Group Inc 9.00 1
02/01/2001 02/23/2001 Rio Group Inc 95.00 1
01/03/2001 01/03/2001 Rio Group Inc 3.50 1
11/30/2000 11/30/2000 Rio Group Inc 10.00 1
06/30/2000 08/25/2000 Rio Group Inc 56.00 1
03/01/2000 03/01/2000 Rio Group Inc 4.00 1
02/23/2000 02/23/2000 Rio Group Inc 3.00 1
01/20/2000 03/01/2000 Rio Group Inc 45.00 1
01/13/2000 01/21/2000 Rio Group Inc 5.50 1