Hollow-Core Slab of PR — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
05/14/2019 05/14/2019 Hollow-Core Slab of PR 4.50 1
02/28/2019 02/28/2019 Hollow-Core Slab of PR 3.00 1
11/14/2018 11/14/2018 Hollow-Core Slab of PR 3.00 1
09/07/2018 09/07/2018 Hollow-Core Slab of PR 5.50 1
05/03/2018 05/03/2018 Hollow-Core Slab of PR 6.00 1