Huachuca Concrete Wash Plant #2 — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
09/14/2011 09/14/2011 Huachuca Concrete Inc 0.50 1
05/09/2011 05/09/2011 Huachuca Concrete Inc 1.00 1
03/07/2011 03/07/2011 Huachuca Concrete Inc 0.25 1
11/02/2009 11/04/2009 Huachuca Concrete Inc 5.50 1
03/27/2009 03/27/2009 Huachuca Concrete Inc 4.00 1
03/25/2009 03/25/2009 Huachuca Concrete Inc 9.00 1
02/05/2008 02/06/2008 Huachuca Concrete Inc 6.00 1
06/19/2007 06/19/2007 Huachuca Concrete Inc 4.50 1
06/06/2007 06/07/2007 Huachuca Concrete Inc 9.50 1
01/05/2007 01/05/2007 Huachuca Concrete Inc 6.00 1
09/20/2006 09/20/2006 Huachuca Concrete Inc 4.50 1
09/13/2006 09/14/2006 Huachuca Concrete Inc 12.50 1