HUNT MINE — Inspections

Total: 13 inspections

Begin End Operator Hours Inspectors
07/31/2025 07/31/2025 Blair Construction 9.50 1
11/02/2023 11/06/2023 Blair Construction 12.25 1
08/31/2023 08/31/2023 Blair Construction 6.75 1
04/22/2022 04/22/2022 Blair Construction 6.75 1
08/05/2021 08/05/2021 Blair Construction 6.25 1
10/28/2019 11/01/2019 Blair Construction 14.75 1
06/06/2019 06/10/2019 Blair Construction 3.50 1
06/06/2019 06/10/2019 Blair Construction 4.00 1
09/06/2018 09/06/2018 Blair Construction 5.00 1
06/12/2017 06/12/2017 Blair Construction 4.00 1
05/22/2017 05/23/2017 Blair Construction 3.00 1
05/02/2017 05/10/2017 Blair Construction 11.75 1
05/02/2017 05/10/2017 Blair Construction 18.75 1