hwy 27 plant — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
01/06/2026 01/09/2026 solid rock sand and gravel 14.00 1
09/16/2025 09/22/2025 solid rock sand and gravel 12.00 1
01/30/2025 01/30/2025 solid rock sand and gravel 3.50 1
06/25/2024 06/25/2024 solid rock sand and gravel 0.00 0
02/28/2024 02/29/2024 solid rock sand and gravel 6.25 1
04/20/2023 04/20/2023 solid rock sand and gravel 12.50 1