Island #1 Prep Plant — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
04/11/2000 06/13/2000 Lst Inc 36.50 3
03/07/2000 03/08/2000 Lst Inc 17.00 1
02/14/2000 03/31/2000 Lst Inc 216.75 4
02/08/2000 02/16/2000 Lst Inc 10.00 1
02/02/2000 02/07/2000 Lst Inc 12.00 1