Ivanhoe Plant 2 (Goon Island) — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 09/22/2025 | 09/23/2025 | United Sand & Gravel, LLC | 16.75 | 1 |
| 04/30/2025 | 05/01/2025 | United Sand & Gravel, LLC | 8.25 | 1 |
| 02/26/2025 | 02/27/2025 | United Sand & Gravel, LLC | 13.00 | 1 |
| 09/04/2024 | 09/05/2024 | United Sand & Gravel, LLC | 18.00 | 1 |