J A T Strippings — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
09/28/2009 09/28/2009 J A T Mining 5.25 1
02/24/2009 02/26/2009 J A T Mining 8.00 2
04/02/2008 04/02/2008 Chestnut Coal Co 4.00 1
11/19/2007 11/19/2007 Chestnut Coal Co 7.00 2
03/20/2007 03/28/2007 Chestnut Coal Co 6.50 1
12/19/2006 12/19/2006 Chestnut Coal Co 5.00 1
10/31/2006 11/01/2006 Chestnut Coal Co 6.00 1