Jackson Valley Quarry — Inspections

Total: 73 inspections

Begin End Operator Hours Inspectors
11/05/2008 11/14/2008 George Reed Inc 26.00 1
03/26/2008 03/27/2008 George Reed Inc 17.75 1
11/20/2007 11/20/2007 George Reed Inc 13.00 1
05/30/2007 05/30/2007 George Reed Inc 11.50 1
11/29/2006 11/30/2006 George Reed Inc 14.00 1
09/05/2006 09/05/2006 George Reed Inc 2.50 1
08/28/2006 08/29/2006 George Reed Inc 13.50 1
03/21/2006 03/22/2006 George Reed Inc 25.00 1
10/17/2005 10/17/2005 George Reed Inc 3.50 1
09/22/2005 09/23/2005 George Reed Inc 12.75 1
01/19/2005 01/21/2005 George Reed Inc 21.00 1
04/13/2004 04/14/2004 George Reed Inc 2.00 1
04/07/2004 04/08/2004 George Reed Inc 24.00 1
12/04/2003 12/05/2003 George Reed Inc 20.00 1
08/28/2003 08/28/2003 George Reed Inc 2.00 1
01/15/2003 01/15/2003 George Reed Inc 5.00 1
12/31/2002 12/31/2002 George Reed Inc 6.00 2
11/19/2002 11/20/2002 George Reed Inc 16.00 1
10/22/2002 10/22/2002 George Reed Inc 2.00 1
03/13/2002 03/14/2002 George Reed Inc 13.00 1
03/14/2001 03/15/2001 George Reed Inc 13.00 1
03/02/2001 03/02/2001 George Reed Inc 1.00 1
02/03/2000 02/03/2000 George Reed Inc 3.00 1