K300 Portable Cone Plant — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
10/16/2024 10/16/2024 Crow River Construction 1.75 1
10/08/2024 10/08/2024 Crow River Construction 5.25 1
06/25/2024 06/26/2024 Crow River Construction 18.75 1
05/22/2024 05/22/2024 Crow River Construction 1.25 1
06/28/2023 06/28/2023 Crow River Construction 5.00 1
08/08/2022 08/09/2022 Crow River Construction 10.75 1