Kandace Mine — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
04/03/2019 04/04/2019 Can Do Excavating Inc 9.75 1
11/21/2017 11/21/2017 Can Do Excavating Inc 7.00 1
08/08/2017 08/08/2017 Can Do Excavating Inc 12.25 1
07/25/2017 07/26/2017 Can Do Excavating Inc 21.50 1
05/11/2016 05/12/2016 Can Do Excavating Inc 16.75 1