Kemmerer Mine — Inspections

Total: 320 inspections

Begin End Operator Hours Inspectors
11/05/2001 12/03/2001 Chevron Mining Inc 119.50 1
09/10/2001 09/10/2001 Chevron Mining Inc 10.00 1
07/22/2001 07/30/2001 Chevron Mining Inc 6.00 1
07/16/2001 07/30/2001 Chevron Mining Inc 6.00 1
07/16/2001 07/30/2001 Chevron Mining Inc 7.00 1
07/01/2001 08/14/2001 Chevron Mining Inc 164.00 1
03/19/2001 03/21/2001 Chevron Mining Inc 17.50 1
03/14/2001 03/14/2001 Chevron Mining Inc 10.00 1
02/05/2001 02/21/2001 Chevron Mining Inc 6.00 1
01/05/2001 01/08/2001 Chevron Mining Inc 6.00 1
11/06/2000 02/02/2001 Chevron Mining Inc 112.50 2
10/30/2000 11/06/2000 Chevron Mining Inc 23.00 1
09/12/2000 09/18/2000 Chevron Mining Inc 34.00 1
08/10/2000 08/14/2000 Chevron Mining Inc 19.00 1
08/07/2000 09/18/2000 Chevron Mining Inc 137.00 3
06/21/2000 06/29/2000 Chevron Mining Inc 27.50 1
05/02/2000 05/10/2000 Chevron Mining Inc 44.00 1
03/13/2000 03/14/2000 Chevron Mining Inc 6.00 1
02/08/2000 02/15/2000 Chevron Mining Inc 97.50 2
01/25/2000 03/29/2000 Chevron Mining Inc 170.00 1