King Mine #1 — Inspections

Total: 55 inspections

Begin End Operator Hours Inspectors
08/09/2001 08/13/2001 Scorpio Mining Inc 14.00 2
05/30/2001 06/19/2001 Scorpio Mining Inc 35.50 2
05/23/2001 05/23/2001 Scorpio Mining Inc 11.50 1
04/16/2001 06/04/2002 Scorpio Mining Inc 47.00 2
03/14/2001 06/12/2001 Scorpio Mining Inc 76.00 3