KING PIT — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
03/06/2007 03/08/2007 AKT MATERIALS, INC. 14.75 1
03/21/2006 03/21/2006 AKT MATERIALS, INC. 1.50 1
12/09/2004 12/09/2004 AKT MATERIALS, INC. 9.00 1
05/19/2004 05/20/2004 AKT MATERIALS, INC. 5.00 1
11/04/2002 11/05/2002 AKT MATERIALS, INC. 10.00 1
01/31/2002 02/01/2002 AKT MATERIALS, INC. 10.00 1
03/21/2001 03/21/2001 AKT MATERIALS, INC. 8.00 1
09/06/2000 09/07/2000 AKT MATERIALS, INC. 8.00 1