Kingston No. 2 — Inspections

Total: 255 inspections

Begin End Operator Hours Inspectors
02/21/2002 03/01/2002 Kingston Mining, Inc. 16.50 2
02/08/2002 02/08/2002 Kingston Mining, Inc. 5.00 1
01/24/2002 03/21/2002 Kingston Mining, Inc. 49.50 2
01/17/2002 01/23/2002 Kingston Mining, Inc. 8.00 1
01/14/2002 01/14/2002 Kingston Mining, Inc. 4.50 1