Kodak Gob Pile — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
06/06/2014 06/06/2014 KYZ Red Oak Resources, LLC 1.50 1
02/26/2014 02/26/2014 Triton Energy Coal, Inc. 2.50 1
02/22/2012 02/29/2012 Triton Energy Coal, Inc. 18.00 4