KPI-JCI CONE/JAW — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
07/01/2025 07/01/2025 OK Gravel Works 5.00 1
01/22/2025 01/23/2025 OK Gravel Works 2.00 1
09/16/2024 09/17/2024 OK Gravel Works 12.00 1
08/03/2023 08/03/2023 OK Gravel Works 4.00 1
08/03/2023 08/03/2023 OK Gravel Works 0.75 1
08/25/2022 08/25/2022 OK Gravel Works 5.00 1