KPI-JCI K300+6203CC(SC26) — Inspections
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 03/12/2024 | 03/19/2024 | Cherry Hill Construction Inc | 10.50 | 1 |
| 09/28/2023 | 09/29/2023 | Cherry Hill Construction Inc | 4.25 | 1 |
| 03/08/2023 | 03/09/2023 | Cherry Hill Construction Inc | 4.25 | 1 |