Lake Fork Pit — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
08/05/2009 08/05/2009 Clearwater Concrete Inc 6.50 1
02/09/2009 02/09/2009 Clearwater Concrete Inc 2.00 1
07/15/2008 07/17/2008 Clearwater Concrete Inc 9.50 1
09/19/2007 09/19/2007 Clearwater Concrete Inc 0.50 1
08/15/2007 08/16/2007 Clearwater Concrete Inc 9.50 1
08/22/2006 08/22/2006 Clearwater Concrete Inc 3.00 1
08/15/2006 08/15/2006 Clearwater Concrete Inc 3.00 1
08/08/2006 08/09/2006 Clearwater Concrete Inc 12.50 1