Linck-Screen Plant — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
08/25/2025 08/25/2025 Linck Aggregates, Inc. 9.00 1
04/17/2024 04/18/2024 Linck Aggregates, Inc. 13.25 1
11/18/2004 11/23/2004 Linck Aggregates, Inc. 39.00 1