Total: 31 inspections

Begin End Operator Hours Inspectors
07/15/2025 07/16/2025 Grand Gravel Pit LLC 6.50 1
07/10/2024 07/10/2024 Grand Gravel Pit LLC 1.25 1
01/20/2023 01/20/2023 Grand Gravel Pit LLC 4.00 1
11/08/2022 11/09/2022 Grand Gravel Pit LLC 20.50 1
08/16/2022 08/17/2022 Grand Gravel Pit LLC 10.25 1
09/16/2021 09/17/2021 Grand Gravel Pit LLC 12.25 2
09/15/2021 09/24/2021 Grand Gravel Pit LLC 48.75 2
12/02/2019 12/02/2019 Grand Gravel Pit LLC 2.50 1
10/22/2018 10/25/2018 Grand Gravel Pit LLC 31.00 1
05/30/2018 05/31/2018 Grand Gravel Pit LLC 30.00 1
07/19/2016 07/19/2016 Linke Construction Inc 4.50 1
06/21/2016 06/21/2016 Linke Construction Inc 2.00 1
06/01/2016 06/02/2016 Linke Construction Inc 24.00 1
08/25/2015 08/25/2015 Linke Construction Inc 0.50 1
08/25/2015 09/08/2015 Linke Construction Inc 16.00 1
08/12/2014 08/12/2014 Linke Construction Inc 6.00 1
07/15/2013 07/16/2013 Linke Construction Inc 18.00 1
06/19/2012 06/19/2012 Linke Construction Inc 6.00 1
09/07/2011 09/08/2011 Linke Construction Inc 12.50 1
11/24/2009 11/24/2009 Linke Construction Inc 2.50 1
11/24/2009 11/24/2009 Linke Construction Inc 1.00 1
11/19/2009 11/19/2009 Linke Construction Inc 7.00 1
07/08/2009 07/08/2009 Linke Construction Inc 1.50 1
07/01/2009 07/02/2009 Linke Construction Inc 6.50 1
07/22/2008 08/01/2008 Linke Construction Inc 12.50 1
06/05/2007 06/06/2007 Linke Construction Inc 13.50 1
11/07/2006 11/09/2006 Linke Construction Inc 16.25 1
04/19/2005 04/26/2005 Linke Construction Inc 33.00 1
06/13/2002 06/19/2002 Linke Construction Inc 12.00 2
10/12/2000 10/12/2000 Linke Construction Inc 3.00 1
08/30/2000 08/31/2000 Linke Construction Inc 6.00 1