LS180 — Inspections

Total: 24 inspections

Begin End Operator Hours Inspectors
09/21/2010 09/22/2010 Laredo Paving Inc 8.50 1
03/31/2009 03/31/2009 Laredo Paving Inc 3.50 1
11/05/2008 11/06/2008 Laredo Paving Inc 4.75 1
09/09/2008 09/09/2008 Laredo Paving Inc 16.50 1
04/10/2008 04/10/2008 Laredo Paving Inc 8.50 1
01/16/2008 01/17/2008 Laredo Paving Inc 3.75 1
09/11/2007 09/11/2007 Laredo Paving Inc 8.00 1
04/17/2007 04/19/2007 Laredo Paving Inc 30.50 1
07/27/2006 07/28/2006 Laredo Paving Inc 17.00 1
03/02/2006 03/02/2006 Laredo Paving Inc 6.00 1
01/12/2006 01/12/2006 Laredo Paving Inc 10.00 1
05/11/2005 05/11/2005 Laredo Paving Inc 3.50 1
04/14/2004 04/14/2004 Laredo Paving Inc 11.00 1
11/05/2003 11/05/2003 Laredo Paving Inc 2.00 1
08/12/2003 08/12/2003 Laredo Paving Inc 8.00 1
01/09/2003 01/09/2003 Laredo Paving Inc 7.00 1
05/30/2002 05/30/2002 Laredo Paving Inc 8.00 1
12/03/2001 12/03/2001 Laredo Paving Inc 3.00 1
10/24/2001 10/24/2001 Laredo Paving Inc 13.00 1
06/20/2001 06/20/2001 Laredo Paving Inc 14.00 1
12/11/2000 12/11/2000 Laredo Paving Inc 6.00 1
09/30/2000 09/30/2000 Laredo Paving Inc 4.00 1
09/29/2000 10/06/2000 Laredo Paving Inc 79.00 2
06/22/2000 06/23/2000 Laredo Paving Inc 18.00 1