M5 Wash Plant & Dry Screen — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
11/05/2025 11/06/2025 Miller Excavating Inc 7.00 1
10/24/2024 10/24/2024 Miller Excavating Inc 10.50 1
12/27/2023 12/27/2023 Miller Excavating Inc 16.25 1
10/17/2022 10/17/2022 Miller Excavating Inc 10.25 1
09/13/2022 09/14/2022 Miller Excavating Inc 18.25 1