Marmet Dock No 1 — Inspections

Total: 16 inspections

Begin End Operator Hours Inspectors
07/03/2003 07/03/2003 Kanawha River Terminals Inc 2.00 1
10/09/2002 10/09/2002 Kanawha River Terminals Inc 12.00 1
10/04/2002 11/18/2002 Kanawha River Terminals Inc 16.00 2
05/30/2002 05/30/2002 Kanawha River Terminals Inc 7.00 1
05/23/2002 07/09/2002 Kanawha River Terminals Inc 11.50 1
05/22/2002 05/30/2002 Kanawha River Terminals Inc 32.00 3
03/18/2002 03/29/2002 Kanawha River Terminals Inc 3.00 1
02/06/2002 02/28/2002 Kanawha River Terminals Inc 3.75 1
02/01/2002 02/01/2002 Kanawha River Terminals Inc 8.00 1
09/10/2001 09/12/2001 Kanawha River Terminals Inc 18.50 1
04/24/2001 04/24/2001 Kanawha River Terminals Inc 8.00 1
04/11/2001 04/12/2001 Kanawha River Terminals Inc 20.00 1
09/19/2000 09/26/2000 Kanawha River Terminals Inc 27.00 1
03/22/2000 03/23/2000 Kanawha River Terminals Inc 8.00 1
03/22/2000 03/23/2000 Kanawha River Terminals Inc 12.00 1
02/29/2000 03/07/2000 Kanawha River Terminals Inc 26.00 2