Matador Pit — Inspections
Total: 18 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/30/2014 | 07/01/2014 | Duininck, Inc. | 6.25 | 1 |
| 02/13/2014 | 02/13/2014 | Duininck, Inc. | 12.00 | 1 |
| 05/22/2013 | 05/22/2013 | Duininck, Inc. | 4.00 | 1 |
| 05/14/2013 | 05/16/2013 | Duininck, Inc. | 27.50 | 1 |
| 01/04/2012 | 01/05/2012 | Duininck, Inc. | 8.50 | 1 |
| 04/12/2011 | 04/12/2011 | Duininck, Inc. | 2.50 | 1 |
| 04/05/2011 | 04/06/2011 | Duininck, Inc. | 19.50 | 1 |
| 10/28/2010 | 10/28/2010 | Duininck, Inc. | 6.50 | 1 |
| 10/05/2010 | 10/05/2010 | Duininck, Inc. | 12.00 | 1 |
| 10/07/2009 | 10/08/2009 | Duininck, Inc. | 11.00 | 1 |
| 03/18/2009 | 03/19/2009 | Duininck, Inc. | 15.00 | 1 |
| 09/19/2008 | 09/24/2008 | Duininck, Inc. | 22.00 | 1 |
| 07/07/2008 | 07/09/2008 | Duininck, Inc. | 6.00 | 1 |
| 06/09/2008 | 06/10/2008 | Duininck, Inc. | 19.00 | 1 |
| 04/21/2008 | 05/22/2008 | Duininck, Inc. | 40.00 | 1 |
| 02/14/2008 | 02/15/2008 | Duininck, Inc. | 13.00 | 1 |
| 08/15/2007 | 08/15/2007 | Duininck, Inc. | 14.00 | 1 |
| 03/27/2007 | 03/27/2007 | Duininck, Inc. | 18.50 | 2 |