MAYBROOK MATERIALS PLANT #80 — Inspections
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/20/2002 | 06/20/2002 | Callanan Industries Inc | 3.00 | 1 |
| 08/22/2001 | 08/22/2001 | Callanan Industries Inc | 8.00 | 1 |
| 04/26/2000 | 04/27/2000 | Callanan Industries Inc | 14.00 | 1 |