MC 10 — Inspections
Total: 13 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 08/28/2013 | 09/04/2013 | G Lopes Construction Inc | 19.50 | 1 |
| 02/16/2012 | 02/16/2012 | G Lopes Construction Inc | 3.75 | 1 |
| 04/18/2011 | 04/20/2011 | G Lopes Construction Inc | 23.00 | 1 |
| 01/13/2011 | 01/13/2011 | G Lopes Construction Inc | 6.50 | 1 |
| 08/17/2010 | 08/18/2010 | G Lopes Construction Inc | 9.75 | 1 |
| 03/23/2009 | 03/27/2009 | G Lopes Construction Inc | 29.75 | 1 |
| 12/16/2008 | 12/16/2008 | G Lopes Construction Inc | 1.50 | 1 |
| 12/02/2008 | 12/04/2008 | G Lopes Construction Inc | 4.50 | 1 |
| 07/28/2008 | 07/29/2008 | G Lopes Construction Inc | 6.00 | 1 |
| 07/16/2008 | 07/16/2008 | G Lopes Construction Inc | 9.75 | 1 |
| 05/19/2008 | 05/20/2008 | G Lopes Construction Inc | 5.75 | 1 |
| 01/17/2007 | 01/18/2007 | G Lopes Construction Inc | 8.00 | 1 |
| 02/21/2006 | 02/23/2006 | G Lopes Construction Inc | 11.75 | 1 |