MC 11 — Inspections
Total: 11 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/16/2012 | 02/17/2012 | G Lopes Construction Inc | 3.75 | 1 |
| 04/19/2011 | 04/20/2011 | G Lopes Construction Inc | 7.00 | 1 |
| 04/12/2011 | 04/12/2011 | G Lopes Construction Inc | 2.50 | 1 |
| 03/21/2011 | 03/22/2011 | G Lopes Construction Inc | 5.75 | 1 |
| 12/07/2009 | 12/07/2009 | G Lopes Construction Inc | 8.00 | 1 |
| 11/16/2009 | 11/18/2009 | G Lopes Construction Inc | 16.00 | 1 |
| 02/09/2009 | 02/12/2009 | G Lopes Construction Inc | 23.25 | 1 |
| 05/28/2008 | 05/29/2008 | G Lopes Construction Inc | 5.50 | 1 |
| 01/25/2007 | 01/25/2007 | G Lopes Construction Inc | 1.50 | 1 |
| 01/17/2007 | 01/18/2007 | G Lopes Construction Inc | 6.50 | 1 |