MC15 Thunderbird — Inspections

Total: 18 inspections

Begin End Operator Hours Inspectors
06/04/2024 06/28/2024 G. Lopes Construction 2.00 1
05/08/2024 05/08/2024 G. Lopes Construction 3.00 1
04/08/2024 04/08/2024 G. Lopes Construction 1.50 1
02/20/2024 02/20/2024 G. Lopes Construction 3.75 1
01/10/2024 01/12/2024 G. Lopes Construction 1.00 1
11/29/2023 12/01/2023 G. Lopes Construction 1.50 1
11/13/2023 11/14/2023 G. Lopes Construction 12.25 1
07/12/2022 07/12/2022 G. Lopes Construction 1.75 1
12/08/2020 12/10/2020 G. Lopes Construction 14.75 1
03/10/2020 03/13/2020 G. Lopes Construction 24.25 1
03/21/2019 03/26/2019 G. Lopes Construction 19.75 1
03/27/2018 03/28/2018 G. Lopes Construction 17.00 1
08/30/2017 08/30/2017 G. Lopes Construction 4.00 1
09/08/2016 09/08/2016 G. Lopes Construction 22.50 1
08/26/2015 08/28/2015 G. Lopes Construction 21.75 1
07/10/2014 07/11/2014 G. Lopes Construction 7.50 1
08/27/2013 08/28/2013 G. Lopes Construction 13.75 1
08/13/2012 08/14/2012 G. Lopes Construction 21.50 1