McCloskey Plant 2 — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/30/2008 | 04/30/2008 | Gentner Materials | 2.50 | 1 |
| 08/27/2007 | 08/28/2007 | Gentner Materials | 6.00 | 1 |
| 12/27/2006 | 12/27/2006 | Gentner Materials | 6.00 | 1 |
| 08/28/2006 | 08/29/2006 | Gentner Materials | 6.50 | 1 |
| 08/01/2005 | 08/03/2005 | Gentner Materials | 5.25 | 1 |