McCook Yards — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
10/19/2010 10/19/2010 Walsh Construction 14.25 2
01/05/2010 01/05/2010 Walsh Construction 4.50 1
12/16/2009 12/17/2009 Walsh Construction 28.00 1
11/17/2009 11/17/2009 Walsh Construction 8.00 1