McCook Yards — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/19/2010 | 10/19/2010 | Walsh Construction | 14.25 | 2 |
| 01/05/2010 | 01/05/2010 | Walsh Construction | 4.50 | 1 |
| 12/16/2009 | 12/17/2009 | Walsh Construction | 28.00 | 1 |
| 11/17/2009 | 11/17/2009 | Walsh Construction | 8.00 | 1 |