MENDON WASH PLANT — Inspections

Total: 36 inspections

Begin End Operator Hours Inspectors
05/07/2025 05/07/2025 Casella Construction Inc 8.50 1
08/29/2024 08/29/2024 Casella Construction Inc 6.75 1
03/17/2024 03/18/2024 Casella Construction Inc 7.75 1
10/31/2022 11/03/2022 Casella Construction Inc 26.00 1
05/25/2022 05/27/2022 Casella Construction Inc 5.25 1
11/24/2020 11/30/2020 Casella Construction Inc 13.50 1
11/06/2019 11/12/2019 Casella Construction Inc 5.50 1
06/12/2019 06/12/2019 Casella Construction Inc 3.75 1
06/05/2019 06/06/2019 Casella Construction Inc 10.25 1
07/31/2018 08/06/2018 Casella Construction Inc 5.75 1
05/22/2017 05/25/2017 Casella Construction Inc 8.75 1
05/17/2017 05/22/2017 Casella Construction Inc 14.50 1
09/26/2016 09/29/2016 Casella Construction Inc 12.00 1
11/02/2015 11/09/2015 Casella Construction Inc 15.00 1
10/01/2014 10/01/2014 Casella Construction Inc 7.25 1
10/23/2013 10/23/2013 Casella Construction Inc 4.00 1
09/16/2013 10/17/2013 Casella Construction Inc 13.00 1
06/17/2013 06/18/2013 Casella Construction Inc 11.25 1
08/02/2011 08/02/2011 Casella Construction Inc 1.00 1
05/17/2010 05/17/2010 Casella Construction Inc 4.25 1
05/10/2010 05/13/2010 Casella Construction Inc 0.50 1
04/19/2010 04/20/2010 Casella Construction Inc 7.75 1
07/21/2009 07/22/2009 Casella Construction Inc 14.00 1
06/10/2008 06/12/2008 Casella Construction Inc 11.50 2
10/12/2006 10/12/2006 Casella Construction Inc 4.25 1
06/20/2006 06/21/2006 Casella Construction Inc 9.25 1
08/17/2005 08/18/2005 Casella Construction Inc 9.25 1
10/28/2003 10/28/2003 Casella Construction Inc 4.00 1
10/08/2003 10/09/2003 Casella Construction Inc 26.00 2
08/06/2003 08/06/2003 Casella Construction Inc 1.00 1
02/25/2003 02/25/2003 Casella Construction Inc 6.00 1
10/23/2002 10/23/2002 Casella Construction Inc 2.00 1
04/04/2002 04/04/2002 Casella Construction Inc 6.00 1
01/04/2001 01/05/2001 Casella Construction Inc 18.00 1
09/28/2000 09/28/2000 Casella Construction Inc 3.00 1
06/08/2000 06/09/2000 Casella Construction Inc 16.00 2