METSO PLANT #2 — Inspections

Total: 10 inspections

Begin End Operator Hours Inspectors
10/01/2025 10/01/2025 SIDWELL MATERIALS INC 17.00 1
10/01/2024 10/02/2024 SIDWELL MATERIALS INC 15.50 1
04/09/2024 04/11/2024 SIDWELL MATERIALS INC 29.25 1
08/03/2023 08/07/2023 SIDWELL MATERIALS INC 9.75 1
09/22/2022 09/22/2022 SIDWELL MATERIALS INC 6.00 1
09/29/2021 10/01/2021 SIDWELL MATERIALS INC 22.25 1
08/31/2021 09/03/2021 SIDWELL MATERIALS INC 13.50 1
07/13/2020 07/24/2020 SIDWELL MATERIALS INC 27.50 2
01/07/2019 01/07/2019 SIDWELL MATERIALS INC 4.00 1
11/30/2018 12/20/2018 SIDWELL MATERIALS INC 38.00 1